|
|
| Dashboard : Timetables : Cost Control : Reporting | Technology |
 |
Schedules are defined and maintained through powerful integration with Microsoft® Project. Each document is assigned a start and end date. Every document is tracked against the schedule, and those outside timetable parameters are flagged for corrective action.
- Real-Time Visibility
- Microsoft Project Integration
- Closed Loop Scheduling System
"Horizon builds and maintains an internal project schedule for each item, allowing you full flexibility in managing timetables."
|
|
|
©2005-2010 Inmedius, Inc. All rights reserved.